FAQ - Frequently asked questions
What is FAST BASE and how does it work?
FAST BASE is the new generation of high-density panel base system that replaces
traditional compacted aggregate-base installations. It provides great stability to
hardscape and artificial grass installations while reducing the required excavation.

What are the main advantages of using FAST BASE?
FAST BASE offers numerous advantages:
– Reduces excavation work and related costs
– Minimizes the use of sand and gravel
– Saves over 20% on labor costs.
In addition, it reduces the effects of freezing and thawing, is permeable (draining), and offers better load transfer. Installation is faster, facilitated by sliding the slabs onto the panel.

Reduces excavation activity

Reduces the use of gravel and sand

Reduces labor costs (over 20% less)

Quicker installation
For which types of surfaces or applications is FAST BASE best suited?
FAST BASE is ideal for pedestrian pavements.
Used applications include rectified paving, interlocking paving, and synthetic grass.



Is FAST BASE draining?
Gravel, panels and slope ensure the necessary proper drainage.
What are the steps for preparing the substrate for installing FAST BASE?
The FAST BASE installation procedure includes the following steps:
Remove the surface layer and compact the soil
Use sand or pea gravel to prepare the base
Level evenly with a leveling rod
Position FAST BASE and cut it on the perimeter
Install the surfaces (use DLG spacers with rectified pavers)
For information on installation:

What maintenance is required for surfaces installed with FAST BASE?
FAST BASE provides great stability to installations, which suggests greater durability.
It reduces the effects of freezing and thawing, contributing to the longevity of the installation.
Specific maintenance will depend on the type of flooring or synthetic grass used.
Is it ideal for heated flooring systems?
Yes, FAST BASE is also ideal for heated flooring systems.
